The project Involved replacing the existing outdated boiler plant with 2 new Broag Quinta condensing boilers complete with low loss header connecting onto the 5 number existing heating circuits, re-piping of all domestic hot & cold water services within the plantroom and manufacturing new control panel with associated wiring within the plantroom all of which was carried out in the 3 week time scale.